Waste-to-energy Boiler

DHB Boiler is a leading global manufacturer of Waste-to-energy boilers. We offer a wide range of quality Waste-to-energy boilers designed, manufactured and post-maintained, as well as a variety of components to meet your application needs.
WHO WE ARE

Waste-to-energy Boiler manufacturer

As a global leader in the manufacture of waste to-energy boilers, DHB’s waste to energy boilers are designed to meet the needs of industrial operations. Our engineers can design the right waste to energy boiler for your application at a competitive price and delivery. DHB’s waste to energy boilers convert waste from production and living into energy that can be used twice, not only preventing waste from polluting the environment, but also making a further contribution to greening the environment.

We have helped our customers to significantly reduce their costs, and we also carry out projects with complete turnkey start-up requirements for newly designed and built plants.

Waste-to-energy boilers are very beneficial in heating systems for a number of reasons. These boilers use municipal, agricultural, forest and industrial residues and waste to produce heat and electricity with less environmental impact than fossil fuels. The long-term environmental impact of this energy production is limited because the carbon in biomass is part of the natural carbon cycle; the same cannot be said for the carbon in fossil fuels. The carbon produced by burning fossil fuels stays permanently in the atmosphere. Biomass, on the other hand, is not only a way to save you a lot of money, but it is also the right thing to do to protect the environment.

What is TFB?

Waste-to-energy Boiler
Communicate effectively
More than 20 years of production experience with a group of professional engineers to make our ditching and integration cost lower.
Low-cost solutions
Working with us means lower costs, which allows you to invest more in yourself and expand your impact on the planet.
Super Value
DHB boilers give you the best parts. Thicker just now, thicker cages, and everything lasts longer
Hands-on approach
We provide industry expertise to develop the most rigorous framework for problem solving.
Waste-to-energy Boiler

What is Waste-to-energy Boiler?

TESTIMONIALS

SEE WHAT OUR CUSTOMERS ARE SAYING

I believe that the biomass furnace you designed for me will pay for itself within two years.

Bronny Biomass Boiler

The cooperation with DHB was very smooth, they completed the coal saver for our project in France with amazing speed, and will continue to cooperate in the future.

Allard Boiler Economizer

Thanks to DHB for the timely delivery and making the boiler superheater for our power plant without delaying the normal operation.

Anderson Boiler Superheater

The waste heat boiler designed by DHB is really remarkable and has enabled the secondary energy transition for our plant.

Kiran Rao HRSG

DHB designed the boiler so user-friendly that it saved us labor costs to the point that we were able to complete the assembly on site in the fastest and easiest way possible.

Frank HRSG (French)

    BENEFITS OF A Waste to energy Boiler

    We will work with you to tackle your problems and reverse engineer the perfect solution for your application and needs. We want you to be worry-free, so you can reinvest your time and capital into your company and your communities so we can all impact global sustainability.

    GET IN TOUCH

    LET OUR INDUSTRY EXPERTS CREATE YOUR TAILORED SOLUTIONS

    GET IN TOUCH

    REQUEST A QUOTE

    Manufacturer with 24 years of experience. We supply Alstom, Babcock & Wilcox, Covanta Energy, Amec Foster Wheeler, etc. DHB watches the product production process with you and gives you the rock-bottom price.